1. Project Team for TGP’s Staged Assessment of Chinese Academy of Engineering. TGP’s staged assessment report. Beijing: China Water & Power Press; 2010. Chinese.
2. Project Team for TGP Assessment during Trial Impoundment Period of Chinese Academy of Engineering. Assessment report on TGP assessment during trial impoundment period. Beijing: China Water & Power Press; 2014. Chinese.
3. China Three Gorges Corporation. Report on construction quality of TGP and project operation in 2014. 2015. Chinese.
4. Discussion on TGP’s flood resources utilization and exerting integrated benefit;Zheng;Yangtze River,2013
5. China Three Gorges Corporation. Report on construction quality of TGP and project operation in 2015. 2016. Chinese.