1. Impact of imperfect potential evapotranspiration knowledge on the efficiency and parameters of watershed models;Andréassian;J. Hydrol.,2004
2. Comparison of rainfall-runoff models for flood forecasting. Part 2: calibration and evaluation of models;Bell;Res. Contractor: Inst. Hydrol.,2001
3. High-resolution projections of surface water availability for Tasmania, Australia;Bennett;Hydrol. Earth Syst. Sci.,2012
4. Bennett, J.C., Robertson, D.E., Shrestha, D.L., Wang, Q.J., 2013. Selecting reference streamflow forecasts to demonstrate the performance of NWP-forced streamflow forecasts. In: Piantadosi, J., Anderssen, R.S., Boland, J. (Eds.), MODSIM 2013, 20th International Congress on Modelling and Simulation. Modelling and Simulation Society of Australia and New Zealand, Adelaide, pp. 2611–2617.
5. Performance of the ECMWF and the BoM ensemble prediction systems in the Southern Hemisphere;Bourke;Mon. Weather Rev.,2004