1. A leak-before-break strategy for CANDU primary piping systems;Aggarwal;Int. J. Pres. Ves. & Piping,1986
2. Mukherjee, B., Carpenter, D. & Kozluk, M. J., Fracture resistance of SA106B seamless piping and welds, Trans. 9th SMiRT Conf., August 1987, paper G/F 11/3.
3. Kozluk, M. J., Lin, T.C., Manning, B.W., Misra, A. S., Scarth, D.A. & Vanderglas, M. L., Effects of pressure loading on through-wall cracks, Trans. 9th SMiRT Conf., August 1987, paper G/F 11/5