1. The G/M/1 queue revisited;Adan;Math. Methods Oper. Res.,2005
2. Dividends and the time of ruin under barrier strategies with a capital-exchange agreement;Albrecher;An. Inst. Actuarios Esp.,2015
3. Avram, F., Badescu, A., Breuer, L., Rabehasaina, L., 2015. A capital management problem for a central branch with several subsidiaries (submitted for publication).
4. A two-dimensional ruin problem on the positive quadrant;Avram;Insurance Math. Econom.,2008
5. A two-dimensional risk model with proportional reinsurance;Badescu;J. Appl. Probab.,2011