1. Deep penetrating anchor: subseabed deepwater anchor concept for floaters and other installations;Lieng,1999
2. Deep penetrating anchor: further development, optimisation and capacity clarification;Lieng,2000
3. Low cost anchor system for flexible risers in deep waters;Medeiros,2002
4. Wilde B. Torpedo pile anchors enter the GoM. E&P, October 2009, 1–2. Available from: http://www.intermoor.com/assets/uploads/cms/rows/files/209-4.pdf.
5. Porto EC, Amaral CS, Foppa D, Fernandes JVV, Corr̂ea DC. Pull-out tests and holding capacity evaluation of torpedo piles. Tech Rep 004/2009. PETROBRAS, Rio de Janeiro, Brazil; 2009.