1. Development of High Temperature Thermal Reactors in German;Hecker,1967
2. THTR commissioning and operating experience;Baumer,1989
3. Status of the construction of the THTR-300 MW and the design of a 500 MW follow-on plant;Wittchow;Nucl. Eng. Des.,1984
4. CharacteristicsofadifferentfuelcycleinaPBMR-400forburning reactorgradeplutonium;Mulder;Nucl. Eng. Des.,2008
5. The design features of the HTR-10;Wu;Nucl. Eng. Des.,2002