1. Managed claims procurement strategy (MCPS): a preventive approach;Abdel-Meguid,1996
2. Constructing the Team;Latham,1994
3. Rowlinson SM. An analysis of factors affecting Project Performance in Industrial Buildings, Ph.D. thesis, Brunel University, UK, 1988
4. Critical analysis of time and cost management and traditional contracting;Naoum;Journal of Construction Engineering and Management,1994
5. The influence of client and project team relationships upon construction time performance;Walker;Journal of Construction Procurement,1995