1. Decision No. 23/2020 of 2 October 2020 on the Methodology for Calculating the Value of Lost Load, the Cost of New Entry, and the Reliability Standard,2020
2. ACER’s Preliminary Assessment of Europe’s High Energy Prices and the Current Wholesale Electricity Market Design,2021
3. AEMO, Australian Energy Market Operator, 2019. 2019 Electricity Statement of Opportunities. Report.
4. Pricing reliability options under different electricity price regimes;Andreis;Energy Econ.,2020
5. I-SEM, Integrated Single Electricity Market, 2018. I-SEM Capacity Mechanism: Consultation on Additions and Modifications to the Capacity Requirement & De-rating Factor Calculation Methodology. Technical report.