1. ABB, 2010. ABB Commissions World's Longest and Most Powerful Transmission Link, ABB, Zürich, 〈http://www.abb.com/cawp/seitp202/0e95c62a95789c0bc125776500307cd0.aspx〉 (Accessed: 2012.02.21).
2. Why terrorism does not work;Abrahms;Int. Secur.,2006
3. What terrorists really want;Abrahms;Int. Secur.,2008
4. Analysis of structural vulnerabilities in power transmission grids;Bompard;Int. J. Crit. Infrastruct. protection,2009
5. BP, 2011. Statistical Review of World Energy, June 2011, BP, London.