1. Dynamic aspects governing cement plug placement in deepwater wells;Aranha,2011
2. Experimental and Numerical Study of Drilling Fluid Removal from a Horizontal Wellbore, SPE Annual Technical Conference and Exhibition;Biezen,2000
3. Mud removal and cement placement during primary cementing of an oil well – laminar non-Newtonian displacements in an eccentric annular Hele-Shaw cell;Bittleston;J. Eng. Math.,2002
4. Effect of casing rotation on displacement efficiency of cement slurry in highly deviated wells;Bu;J. Nat. Gas Sci. Eng.,2018
5. Cementing Horizontal Wells: Complete Zonal Isolation without Casing Rotation, CIPC/SPE Gas Technology Symposium 2008 Joint Conference;Carrasco-Teja,2008