1. Investigation of Flow Modifying Tools for the Continuous Unloading of Wet-Gas Wells [M];Ali,2003
2. Design and layout of the cyclone separator on the basis of new investigations;Barth;Brennstoff-Wärme-Kraft [J],1956
3. A study of two-phase flow in inclined pipes;Beggs;J. Petrol. Technol.,1973
4. Two-phase flow pressure change across sudden contraction and expansion in small channels;Chena’li;Adv. Multiphase Flow Heat Trans.,2012
5. Stripper Well Consortium Offers Opportunities and Technologies to the Stripper Well Industry [C]//;Covatch,2005