1. Cost Analysis of Plug and Abandonment Operations on the Norwegian Continental Shelf;Aarlott,2016
2. Cement placement with tubing left in hole during plug and abandonment operations;Aas,2016
3. Offshore plug & abandonment: challenges and technical solutions;Abshire,2013
4. Thermal activated resin to avoid pressure build-up in casing-casing annulus (CCA);Al-Ansari,2015
5. Cement job evaluation;Allouche,2006