1. Parameter Estimation and Inverse Problems;Aster,2013
2. Berg, K.B., Ausen, H., Gregersen, S., Bakken, A., Vannes, K., Smørgrav, S.E., 2015. Tie backs and partner allocation – a model based system for meter verification and monitoring. In: Proceedings of the 33rd International North Sea Flow Measurement Workshop, pp. 1–13. Paper No. 20.
3. Bieker, H.P., Slupphaug, O., Johansen, T.A., 2006. Real time production optimization of offshore oil and gas production systems: A technology survey. In: Proceedings of the SPE Intelligent Energy Conference and Exhibition, Society of Petroleum Engineers. pp. 1–8. 〈http://dx.doi.org/10.2118/99446-MS〉.
4. Chan, P., 2014. Bruk av usikkerhetsanalyser og nåverdiberegninger i konseptfasen (use of uncertainty analysis and net present value calculations in the concept phase). NFOGM Newesletter online. 〈http://nfogm.no/wp-content/uploads/2014/07/Usikkerhet-og-n〉 (accessed 4.04.16.).
5. Improving allocation and hydrocarbon accounting accuracy using new techniques;Cramer;SPE Econ. Manag.,2011