1. 2A-WSD; Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms—Working Stress Design;API,2014
2. The effects of changes in pore water pressures on the carrying capacities and settlements of driven piles end bearing in a sand and gravel stratum, in: , Recent Developments in the Design and Construction of Piles;Armishaw,1979
3. New BAUER Flydrill system, Wintech International;Beyer,2006
4. The third theory of comminution;Bond;T. Metall. Soc. AIME,1952
5. A probabilistic approach for estimating the theoretical net drilling rate for offshore bored piles;Bosco;Geotec. Lett.,2016