1. Arbulu, R.J., Tommelein, I.D., Walsh, K.D., Hershauer, J.C., 2002. Contributors to lead time in construction supply chains: case of pipe supports used in power plants. In: Proceedings of the Winter Simulation Conference, pp. 1745–1751.
2. Towards a theory of price adjustment;Arrow,1959
3. Incentives in Construction Contracts;Ashley,1986
4. Incentives versus transaction cost: a theory of procurement contracts;Bajari;Rand Journal of Economics,2001
5. Ballard, G., 2000. Negative vs. positive iteration in design. In: Proceedings of the 8th Annual Conference on International Group Lean Construction (IGLC-8), 17–19 July, Brighton, UK, pp. 44–55.