1. Planning the installation of large units in interconnected system: related parameters and their relative influence;Paris;CIGRE, Paris,1968
2. Planning generation units for peak load in power systems: relevant parameters and their relative influence;Manzoni;CIGRE, Paris,1970
3. Planning thermal and hydraulic power systems: relevant parameters and their relative influence;Manzoni;CIGRE, Paris,1972
4. Optimization of the basic characteristics of pumped-storage plants;Paris,1974
5. A quantitative evaluation of power system reliability in planning studies;Noferi;IEEE Trans. Power Appar. & Syst.,1972