1. The Light-Pulser Monitoring System for the WASA detector facility;Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment;2009-07
2. Gain stabilization control system of the upgraded magnetic proton recoil neutron spectrometer at JET;Review of Scientific Instruments;2009-06
3. The WASA detector facility at CELSIUS;Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment;2008-09
4. The automatic gain-matching in the PIBETA CsI calorimeter;Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment;2008-08
5. A gain monitoring system with a Nd:YAG laser for the photomultipliers of the HERMES experiment;Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment;2003-12