1. Staff Requirements for Reinspection of BWR Piping and Repair of Cracked Piping;U.S. NRC;SECY 83-267c,1983
2. Investigation and Evaluation of Stress-Corrosion Cracking in Piping of Light Water Reactor Plants;U.S. NRC;NUREG-0531,1979
3. Investigation and Evaluation of Cracking Incidents in Piping in Pressurized Water Reactors;U.S. NRC;NUREG-0691,1980
4. Report of U.S. NRC Piping Review Committee: Investigation and Evaluation of SCC in Piping of BWR Plants;U.S. NRC;NUREG-1061,1984