1. Integrated ATT strategies for urban arteries; DRIVE II project PRIMAVERA: 2, Bus priority in SCOOT and SPOT using TIRIS;Fox;Traffic Engineering and Control,1995
2. Hounsell N. and McDonald M. (1988) Evaluation of bus lanes. Contract Report 87. Transport and Road Research Laboratory, Department of Transport, Crowthorne, U.K.
3. King G. N. (1983) Bus priority in London—techniques for the 1980’s. Proceedings of Seminar K: Traffic operation and management, PTRC 11th Annual Meeting. London.
4. Park view pre-signals in Uxbridge road, England;Oakes;Traffic Engineering and Control,1995
5. Oakes J., ThellMann A. M. and Kelly I. T. (1994) Innovative bus priority measures. Proceedings of Seminar J, Traffic Management and Road Safety, 22nd PTRC European Transport Summer Annual Meeting, University of WARWICK, U.K., vol.381, pp.301–312.