1. Shukla PR, Skea J, Slade R, Khourdajie A Al, van Diemen R, McCollum D. IPCC, 2022: Climate Change 2022: Mitigation of Climate Change. Contribution of Working Group III to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change. Cambridge University Press, Cambridge, UK and New York, NY, USA.; 2022. 10.1017/9781009157926.
2. A techno-economic assessment of CO2 capture in biomass and waste-fired combined heat and power plants – A Swedish case study;Beiron;Int J Greenh Gas Control,2022
3. The BECCS Implementation Gap – A Swedish Case Study;Fuss;Front Energy Res,2021
4. IEA Bioenergy. Large biomass CHP plant in Stockholm Sweden 2018. https://www.ieabioenergy.com/wp-content/uploads/2018/02/8-LargeCHP-Värtaverket_SE_Final.pdf (accessed June 22, 2022).