1. Park N, Jung SH, Park HW, Choi HJ, Chin S. Payback period estimation of ground-source and air-source multi heat pumps in Korea based on yearly running cost simulation. In: International refrigeration and air conditioning conference, paper no. 2496; 2010. p. 1–14.
2. Defrost cycle performance for a circular shape evaporator air source heat pump;Hewitt;Int J Refrig,2008
3. Hot gas defrost model development and validation;Hoffenbecker;Int J Refrig,2005
4. Refrigeration system dynamics during the reverse cycle defrost;O’Neal;ASHRAE Trans,1989
5. Effects of outdoor coil fan prestart on pressure transient during the reverse cycle defrost of a heat pump;Anand;ASHRAE Trans,1989