Author:
Deka Dimbalita,Datta Dilip
Subject
Electrical and Electronic Engineering,Energy Engineering and Power Technology
Reference62 articles.
1. Unit commitment problem with ramp rate constraint using a binary-real-coded genetic algorithm;Datta;Appl. Soft Comput.,2013
2. A fuzzy-genetic algorithm based method for short-term multi-objective unit commitment in large-scale power systems;Ebrahimi,2017
3. Unit commitment literature synopsis;Sheble;IEEE Trans. Power Syst.,1994
4. A genetic algorithm solution to the unit commitment problem;Kazarlis;IEEE Trans. Power Syst.,1996
5. A binary-real-coded differential evolution for unit commitment problem;Datta;Electric. Power Energy Syst.,2012
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献