1. Managing uncertainty in implementation times of competitively-procured transmission via risk-sharing and winner selection functions;Ferreira;IEEE Trans. Power Syst.,2018
2. E. Rodrigues, “62% of transmission lines in progress in the country are overdue, says Aneel”, in Estado de São Paulonewspaper, available online at https://www.estadao.com.br/(in Portuguese).
3. “ISA manifesta preocupación por el retraso de Polpaico - Cardones”, in Electricidadnewspaper, available online at http://www.revistaei.cl.
4. “Cables cruzados”, in Dinero newspaper, available online at http://www.dinero.com/.
5. Osinergmin (Peru), “Contratos de concesión y ampliaciones de Líneas de Transmisión Electrica ‘en Construcción’”, Dec. 2015.