1. Comparison of capacity credit calculation methods for conventional power plants and wind power;Amelin;IEEE Trans. Power Syst.,2009
2. Renewable Energy Integration in zonal markets;Aravena;IEEE Trans. Power Syst.,2017
3. Australian Energy Market Operator (AEMO), 2020. AEMO map. https://www.aemo.com.au/aemo/apps/visualisations/map.html.
4. AEMO 2022 Integrated System Plan: Current inputs, Assumptions and Scenarios,2022
5. Australian Energy Regulator, 2023. State of the energy market 2023. https://www.aer.gov.au/documents/state-energy-market-2023-full-report.