Author:
Abdel-Khalek Hesham A.,Aziz Remon Fayek,Abdellatif Israa A.
Reference14 articles.
1. S. Alkass, M. Mazerolle, E. Tribaldos, F. Harris, Computer aided construction delay analysis and claims, 1995.
2. A database management system to document and analyse construction claims;Al-Sabah;Adv. Eng. Softw.,2003
3. Claims management in the Egyptian industrial construction sector: a contractor’s perspective;Hassanein;Eng., Constr. Archit. Manage.,2008
4. Analytical model for analyzing construction claims and opportunistic bidding;Ho;J. Constr. Eng. Manage.,2004
5. Lixia Song, Junjie Wang, Lijun Song, Fang Guo, Claim management of construction engineering, in: ICCREM 2015: Environment and the Sustainable Building, ASCE, 2015, pp. 696–701.
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献