1. Integrity assessment of the Shinkansen vehicle axle using probabilistic fracture mechanics;Akama,2000
2. Ishizuka H, Sato Y. Fretting fatigue strength of axles for bullet train and their maintenance. Sharing the latest wheelset technology in order to reduce costs and improve railway productivity. Proceedings of the 10th International Wheelset Congress, 1992. p. 195–9.
3. Ishizuka H, Sato Y. Probability of omitting magnetic particle flaw detection and extending ultrasonic test cycle of Shinkansen vehicle axles. Safety and high efficiency, running into the 21st century. Proceedings of the 12th International Wheelset Congress, 1998. p. 357–62.
4. New practical Bayes estimators for the 2-parameter Weibull distribution;Erto;IEEE Trans Reliab,1982
5. Non-periodic inspection by Bayesian method I;Deodatis;Probab Engng Mech,1992