1. Risk Analysis Laboratory. Summary report of seismic PSA of BWR Model Plant. JAERI-Research 99-035; 1999 (in Japanese).
2. Current status of methodologies for seismic probabilistic safety analysis;Budnitz;Reliab Engng Syst Safety,1998
3. Ravindra MK. Seismic PSAs—issues, resolutions and insights. Proceedings of the OECD/NEA Workshop on Seismic Risk, 10–12 August 1999, Tokyo, Japan, NEA/CSNI/R8(99)28; November 2000. p. 431–41.
4. Bohn MP Shieh LC, Wells JE, Cover LC, Bernreuter DL, Chen JC, Johnson JJ, Bumps SE, Mensing RW, O'Connell WJ, Lappa DA. Application of the SSMRP methodology to the seismic risk at the Zion Nuclear Power Plant, NUREG/CR-3428; 1983.
5. Reed JW, McCann Jr. MW, Iihara J, Hadidi-Tamjed H. Analytical techniques for performing probabilistic seismic risk assessment of Nuclear Power Plants. Proceedings of Fourth International Conference on Structural Safety and Reliability (ICOSSAR'85); 1985.