1. Strategy and Action Plan 2015–2025, Terai Arc Landscape, Nepal. Ministry of Forests and Soil Conservation;MoFSC,2015
2. MoEWRI, 2022. Monsoon (June - September 2021) Rainfall Monitoring. Government of Nepal, Ministry of Energy, Water Resource and Irrigation.
3. MoPIT, 2022. Government of Nepal, Ministry of Physical Infrastructure and Transport, Traffic Statistics [WWW Document]. Highway Management Information System (HMIS) UNIT. URL 〈http://ssrn.aviyaan.com/traffic_controller/get_detail/Pathlaiya%20North/1162〉 (Accessed 7.11.22).
4. Integrated step selection analysis: bridging the gap between resource selection and animal movement;Avgar;Methods Ecol. Evol.,2016
5. Relative selection strength: quantifying effect size in habitat‐ and step‐selection inference;Avgar;Ecol. Evol.,2017