Author:
Din Sabariyah,Abd-Hamid Zahidy,Bryde David James
Subject
Management of Technology and Innovation,Business and International Management
Reference73 articles.
1. The significant factors causing delay of building construction projects in Malaysia;Alaghbari;Eng. Const. Arch. Man.,2007
2. The performance measurement of construction projects managed by ISO-certified contractors in Malaysia;Ali;J. Retail Leis. Prop.,2010
3. Arbuckle, G. K., 2004. A comparative study of selected measures of performance of organizations before and after obtaining ISO 9000 certification as compared to the S&P 500 Index. Indiana State University, USA: PhD Thesis.
4. Estimating non-response bias in mail surveys;Armstrong;J. Market. Res.,1997
5. Contribution of quality management tools and practices to project management performance;Barad;Int. J. Qual. Rel. Mgt.,2000
Cited by
40 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献