Monitoring project duration and cost in a construction project by applying statistical quality control charts

Author:

Aliverdi Reza,Moslemi Naeni Leila,Salehipour Amir

Publisher

Elsevier BV

Subject

Management of Technology and Innovation,Business and International Management

Reference42 articles.

1. Integrating technical performance measurement with earned value management;Abba;The Measurable News,2010

2. Monitoring systems and their effectiveness for project control in construction;Al-Jibouri;International Journal of Project Management,2003

3. Earned value project management method and extensions;Anbari;International Journal of Project Management,2003

4. Project management in a global multi-project-on the use of earned value management in the Swedish Gripen Project;Antvik,2000

5. Probabilistic control of project performance using control limit curves;Barraza;Journal of Construction Engineering and Management-ASCE.,2007

Cited by 68 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3