Author:
Liu Quan-li,Wang Xiaodong,Zhan Hongren,Wang Wei,Liu Rui-guo
Reference7 articles.
1. A two-stage methodology for short-term batch plant scheduling:discrete-event simulation and genetic algorithm;Azzaro-Pantel;Computers Chem. Engineering,1998
2. Mathematical model and algorithm for scheduling of steel coils annealing;Jiefang;Iron and Steel,2001
3. Flow simulation and genetic algorithm as optimization tools;Fontanili;Int. J. Production Economics,2000
4. Knowledge-based predictive and reactive scheduling in industrial environments;Henning;Compurers and Chemical Engineering,2000
5. Supporting production planning by production process simulation;Johtela;Computer Integrated Manufacturing Systems,1997