Funder
Natural Sciences and Engineering Research Council of Canada (NSERC) and Iron Ore Company of Canada (IOC)
Subject
Hardware and Architecture,Modeling and Simulation,Software
Reference42 articles.
1. Sampling of run-of-mine mill feed-A practical approach;Afewu;J. South. Afr. Inst. Min. Metall.,1998
2. SME Mining Engineering Handbook;Darling,2011
3. Production planning of mines: Optimisation of block sequencing and destination;Kumral;Int. J. Min. Reclam. Environ.,2012
4. Strategic mine planning model using network flow model and real case application;Topal;Int. J. Min. Reclam.. Environ.,2012
5. Optimising open pit mine scheduling taking into consideration time value of money and mining restrictions;Nanjari;Int. J. Min. Reclam. Environ.,2013
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献