1. Evaluation of risks associated with AOT and STI requirements at the ANO-1 nuclear power plant;Samanta,1988
2. Proposed amendment to the unit 1 and 2 technical specifications based on probabilistic analyses;Houston Lighting & Power;Document ST-HL-AE-3283,1990
3. Analisis de la interaccion entre los requisitos de tiempo maximo permitido de inoperabilidad (AOT) e intervalo entre pruebas de vigilancia (STI) de componentes de sistemas de seguridad de centrales nucleares;Martorell,1991
4. Risk-Based Evaluation of Technical Specifications,1985
5. Continued plant operation versus shutdown in failure situations of standby safety systems;Mankamo,1992