1. Start-up of a large PWR;Nedderman;The Nucl. Eng.,1983
2. Corrosion Product Behaviour During Hot Functional Tests and Normal Operation in Cycle 1 at Sizewell B, Water Chemistry of Nuclear Reactor Systems 7;Garbett,1996
3. J.C. Bates, G.A. Lancaster, M. Scrancher, K. Garbett, Corrosion product monitoring during the seventh refuelling outage at sizewell B, in: Proc. Int. Conf. Water Chem. Nucl. React. Syst., Jeju, Korea, 2006, paper P1.2.
4. C. Bates, K. Garbett, K. Hinds, G. Lancaster, M. Mantell, G. Renn, Development of corrosion product behaviour and radiation fields at the sizewell B PWR from 1995 to 2008, in: Proc. Int. Conf. Water Chem. Nucl. React. Syst., Berlin, Germany, 2008, paper L06–2.
5. E. Yamada, S. Suzuki, T. Hirao, Y. Hashimoto, K. Hisamune, J. Yokoyama, Corrosion rate reduction by chemical control during hot functional testing, in: Proc. JAIF Int. Conf. Water Chem. Nucl. Power Plants, Fukui, Japan, 1991, 151–156.