1. AMEC, 2004. Projected offshore operation and maintenance costs of UK offshore wind farms based on the experience at Blyth. DTI New and Renewable Energy Programme, Crown Publishing, UK.
2. Aquaenergy, 2002. Makah Bay offshore wave energy pilot power plant project description. www.aquaenergy.com.
3. Atkins, Oil & Gas, 1992. A parametric costing model for wave energy technology. ETSU Report No. WV1685.
4. Bedard, R., Hagerman, G., Previsic, M., Siddiqui, O., Thresher, R., Ram, B., 2005. Offshore wave power feasibility demonstration project final summary report. E2I EPRI Global WP 009 – US Rev 1.
5. Matching renewable electricity generation with demand. Academic Study Summary;Boehme,2006