Author:
Stadtler Hartmut,Sahling Florian
Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference23 articles.
1. Baumann, P., Trautmann, N., 2010. An milp approach to short-term scheduling of an industrial make-and-pack production facility with batch splitting and quality release times. In: Lian, Z., Wu, Z., Xie, M., Jiao, R. (Eds.), Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management. Macau, pp. 1230–1234.
2. An extension of the multi-machine multi-level proportional lot sizing and scheduling model for product-life-cycle demand;Chang;International Journal of Operations Research,2004
3. Simultaneous lot sizing and scheduling for multi-product multi-level production;Fandel;International Journal of Production Economics,2006
4. Grünert, T., 1998. Multi-Level Sequence-Dependent Dynamic Lotsizing and Scheduling. Shaker, Aachen.
5. Lotsizing and scheduling for production planning;Haase,1994
Cited by
32 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献