Author:
Thomas André,Charpentier Patrick
Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference22 articles.
1. The shifting bottleneck procedure for the job-shop scheduling;Adams;Management Science,1988
2. Combining knowledge-based systems and simulation to solve rescheduling problems;Belz;Decision Support Systems,1996
3. Simplification in the simulation of manufacturing systems;Brooks;International Journal of Production Research,2000
4. P. Charpentier, A. Thomas, Model reducing method for the scheduling decision-making, IEPM2001, Québec, 2001
5. M. Doumeing, Conception de systé mes flexibles de production, Laboratoire GRAI, 1989
Cited by
28 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献