Author:
Caumond A.,Lacomme P.,Moukrim A.,Tchernev N.
Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference28 articles.
1. A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles;Abdelmaguid;International Journal of Production Research,2004
2. Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies;Anwar;International Journal of Production Research,1998
3. Araki, T., Sugiyama, Y., Kasami, T., Okui, J., 1977. Complexity of the deadlock avoidance problem. In: Proceedings of the Second IBM Symposium on the Mathematical Foundations of Computer Science, IBM Japan, Tokyo, pp. 229–252.
4. Deadlock avoidance in flexible manufacturing systems with concurrently competing process flows;Banaszak;IEEE Transactions on Robotics and Automation,1990
5. A time window approach to simultaneous scheduling of machines and material handling system in an FMS;Bilge;Operations Research,1995
Cited by
65 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献