Author:
Lamghari Amina,Dimitrakopoulos Roussos
Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference39 articles.
1. TTT plots: a perl program to create time-to-target plots;Aiex;Optimization Letters,2007
2. Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons;Albor;IMM Transactions, Mining Technology,2010
3. Introduction to Stochastic Programming;Birge,1997
4. A strengthened formulation and cutting planes for the open pit mine production scheduling problem;Bley;Computers & Operations Research,2010
5. Boland, N., Dumitrescu, I., Froyland, G., 2008. A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology. Optimization Online (last accessed 06.06.11).
Cited by
133 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献