1. Open, closed, and mixed networks of queues with different classes of customers;Baskett;Journal of the ACM (JACM),1975
2. Tradeoff curves, targeting and balancing in manufacturing queueing networks;Bitran;Operations Research,1989
3. Boebel, F., Ruelle, O., 1996. Cycle time reduction program at ACL. In: Proceedings of the Advanced Semiconductor Manufacturing Conference, Cambridge, MA, USA, pp. 165–168.
4. Approximate analysis of general queueing networks;Chandy;IBM Journal of Research and Development,1975
5. Collins, D.W., Williams, K., Hoppensteadt, F.C., 1997. Implementation of minimum inventory variability scheduling 1-step ahead policy in a large semiconductor manufacturing facility. In: Proceedings of the 6th ETFA International Conference, pp. 497–504.