Author:
Erenay Fatih Safa,Sabuncuoglu Ihsan,Toptal Ayşegül,Tiwari Manoj Kumar
Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference37 articles.
1. A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness;Allahverdi;Computers and Operations Research,2004
2. Genetic local search for multi-objective flowshop scheduling problems;Arroyo;European Journal of Operational Research,2005
3. Complexity of single machine multi-criteria scheduling problems;Chen;European Journal of Operational Research,1993
4. Bicriterion static scheduling research for a single machine;Dileepan;Omega,1988
5. One machine sequencing to minimize mean flowtime with minimum tardy;Emmons;Naval Research Logistics Quarterly,1975
Cited by
20 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献