1. Ageeva, Y., Clarke, J.P., 2000. Robust scheduling. Technical Report, Massachusetts Institute of Technology.
2. Barnhart, C., 2001. Planning and control of transportation systems: Robust airline planning. Technical Report, Massachusetts Institute of Technology.
3. Bian, F., Burke, E.K., Jain, S., Kendall, G., Koole, G., Landa Silva, J.D., Mulder, J., Paelinck, M.C.E., Reeves, C., Rusdi, E., Suleman, M.O., 2003. Making airline schedules more robust. In: Proceedings of the 1st Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA 2003), pp. 678–693.
4. Bureau of Transportation Statistics, 2002. 2001 Airline On-time Performance.
5. Constructing robust crew schedules with bi-criteria optimization;Ehrgott;Journal of Multi-Criteria Decision Analysis,2002