1. A survey of algorithms for the single machine total weighted tardiness problem;Abdul-Razaq;Discrete Applied Mathematics,1990
2. A note on the equivalence of two heuristics to minimize total tardiness;Alidaee;European Journal of Operational Research,1997
3. Simulated annealing applied to the total tardiness problem;Antony;Control and Cybernetics,1996
4. A dynamic priority rule for scheduling against due-dates;Baker;Journal of Operations Management,1982
5. Bauer, A., Bullnheimer, B., Hartl, R.F., Strauss, C., 1999. An ant colony optimization approach for the single machine total tardiness problem. In: Proceedings of the 1999 Congress on Evolutionary Computation (CEC99), Washington, DC, USA, pp. 1445–1450.