Author:
Shapiro Alexander,Tekaya Wajdi,da Costa Joari Paulo,Soares Murilo Pereira
Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference16 articles.
1. Composite representation of a multireservoir hydroelectric power system;Arvaniditis;IEEE Transactions on Power Apparatus and Systems,1970
2. Polyhedral risk measures in stochastic programming;Eichhorn;SIAM Journal on Optimization,2005
3. Sampling-based decomposition methods for multistage stochastic programs based on extended polyhedral risk measures;Guigues;SIAM Journal on Optimization,2012
4. Ministry of Mines and Energy MME, Electricity in the Brazilian Energy Plan – PDE 2020, July 2011, Secretariat of Energy Planning and Development.
5. Convex approximations of chance constrained programs;Nemirovski;SIAM Journal on Optimization,2006
Cited by
177 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献