Author:
Allahverdi Ali,Aydilek Harun
Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference44 articles.
1. No-wait flowshops with bicriteria of makespan and total completion time;Allahverdi;Journal of the Operational Research Society,2002
2. Algorithms for No-wait flowshops with total completion time subject to makespan;Allahverdi;International Journal of Advanced Manufacturing Technology,2013
3. Allahverdi, A., Aydilek, H. (2014). The two stage assembly flowshop scheduling problem to minimize total tardiness. Journal of Intelligent Manufacturing, in press.
4. A review of scheduling research involving setup considerations;Allahverdi;OMEGA The International Journal of Management Sciences,1999
5. A survey of scheduling problems with setup times or costs;Allahverdi;European Journal of Operational Research,2008
Cited by
36 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献