1. Staggering periodic replenishments;Pesenti,1999
2. G. Corriga, G. Fadda, S. Sanna, G. Usai, Optimal management of irrigation canal networks with self-levelling gates, Institute of Electrical Engineering, Internal Report No 28, University of Cagliari, Italy, 1982.
3. A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion;Grabowski;Computers and Operations Research,2004
4. J. Grabowski, J. Pempera, Some local search algorithms for no-wait flow shop problem with makespan criterion, Institute of Engineering Cybernetics, Internal Report No 51, Wroclaw University of Technology, Poland, 2003.
5. Management of periodic demands in distribution systems;Gaudioso;European Journal of Operational Research,1985