1. de Almeida SAB, Pestana R, Barbosa FPM, Machado N. Operational risk assessment methodology for the portuguese transmission system. ELECTRA, Invited paper; 2010.
2. de Almeida SAB, Engelbrecht CS, Barbosa FPM, Pestana R. Prediction of faults caused by lightning for transmission system operations. ELECTRA, Invited paper; 2011.
3. de Almeida SAB. Portuguese transmission grid incidents risk assessment. PhD thesis, FEUP; 2010.
4. de Almeida SAB, Lobo J. Gestinc-the incidents data base: purposes, contents, management and automatic indicators calculation future developments. In: 1ere conférence internationale sur le transport de l’ electricité en Algérie; 2005.
5. André AM, Gomes-Mota J. Multi-challenges and benefits of integrated over-head line inspections. In: CIRED09 – Session 20, paper 0848; 2009.