1. National Grid, System Operability Framework SOF 2016 – Full Interactive Document; 2016 . https://www.nationalgrid.com/uk/publications/system-operability-framework-sof [visited on 18–03–2018].
2. Ofgem, D09 OC6.6 Automatic Low Frequency Demand Disconnection (LFDD); 2010. https://www.ofgem.gov.uk/publications-and-updates/d09-oc6.6-automatic-low-frequency-demand-disconnection-lfdd[visited on 18–03–2018].
3. Dysko A, Tzelepis D, Booth C. Assessment of risks resulting from the adjustment of ROCOF based loss of mains protection settings; 2015. https://www.nationalgrid.com/sites/default/files/documents/Appendix%201%20Strathclyde%20Report%201.pdf [visited on 18–03–2018].
4. Mahat P, Chen Z, Bak-Jensen B. Review of islanding detection methods for distributed generation. In: Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies; 2008. p. 2743–8.
5. Comparative analysis between ROCOF and vector surge relays for distributed generation applications;Freitas;IEEE Trans Power Delivery,2005