1. Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation;Eto,2010
2. Commission Regulation (Eu) 2016/631 of 14 April 2016: establishing a network code on requirements for grid connection of generators;ENTSO-E;Official J Eur Union,2016
3. EirGrid. EirGrid Grid Code version 8. Comm Regul Util 2019;1–390.
4. Energinet.dk. Technical regulation 3.2.5 for wind power plants above 11 kW Rev 4.1 2017;1–108. Doc. 13/96336-43.
5. Energy storage system-based power control for grid-connected wind power farm;Ge;Int J Electr Power Energy Syst,2013