Author:
Shi Yiwei,Li Yipu,Zhou Yun,Xu Ran,Feng Donghan,Yan Zheng,Fang Chen
Funder
National Natural Science Foundation of China
Ministry of Science and Technology of the People's Republic of China
Subject
Electrical and Electronic Engineering,Energy Engineering and Power Technology
Reference29 articles.
1. A source-grid-load coordinated power planning model considering the integration of wind power generation;Zhang;Appl Energy,2016
2. Overall review of peak shaving for coal-fired power units in China;Gu;Renew Sustain Energy Rev,2016
3. The impact of outside electricity on the ancillary service of power grid with high-penetration received electricity;Wang;Electric Power,2018
4. Shut-down peaking market mechanism of Zhejiang coal-fired units considering import power allocation;Mei;Electric Power Construction,2016
5. A consideration of the wind power benefits in day-ahead scheduling of wind-coal intensive power systems;Wang;IEEE Trans Power Syst,2013
Cited by
31 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献